|
Gratitude
Garden:
|
Large
staff cabin:
|
|
Removed
all weeds
|
Cleaned,
scraped, and repainted outside
|
|
Edged
garden area with timbers
|
|
|
Covered
entire area with black plastic sheets
|
Craft
Lodge:
|
|
Replanted
all ground plants
|
Covered
front of lodge with new vinyl siding
|
|
Resurfaced
with fresh mulch
|
|
|
Realigned
stone path and added more stone
|
|
|
Repaired
bench
|
Lower
cabins:
|
|
Planted
new tree
|
Removed
and rebuilt outside decks on 2 cabins
|
|
|
|
|
Infirmary:
|
Storage
shed:
|
|
Covered
front of cabin with new vinyl siding
|
Removed
junk contents
|
|
Installed
new ceramic tile floor in bathroom
|
Repaired
front and rear panels
|
|
Painted
bathroom walls and ceiling
|
|
|
|
Pump
house:
|
|
Store:
|
Repainted
all outside trim
|
|
Cleaned
inside floors and appliances
|
|
|
Straightened
out stock
|
Misc.
|
|
Cleaned
outside furniture and made ready for season use
|
Cleaned
out natural cobble wall at pavilion
|
|
|
|
|
Small
staff cabin:
|
|
|
Cleaned,
scraped, and repainted outside
|
|